Mold closing is executed in four phases: Mold Opening Stage 1, Mold Openning Stage 2, Mold Open Stage 3, and Mold Open Stage 4.
Press the Manual key to activate the Manual mode. Switch the
HMI display to the Clamp Setting screen by pressing F2 (Clamp) .
Then, enter the desired hydraulic speed and pressure setting for the 4 mold opening stages. You have to ensure that those settings allow for a smooth, jerk-free movement of the plastic injection mold.
Set the hydraulic speed for the Mold Opening Stage 1 in order to separate the mold platen smoothly.
Adjust the transition point for switching from Mold Openning Stage 1 to Mold Opening Stage 2 according to your requirement.
The transition point setting of switching from Mold Open Stage 3 to Mold Open Stage 4 would allow the mold to slow down sufficiently before reaching the end of position of the Mold Opening Stroke.
If you use any robot to pick the parts out of mold, you have to set the Auto Cycle Delay time (mold platen function). Recycle time is calculated from the time of last cycle to the time before mold close for the next cycle.
After setting all mold opening parameters including the speed, pressure and position, please operate the mold close in Manual mode to clarify your requirements of your presettings. If you encounter any problems during the operation, please press Manual key to stop the plastic injection machine from operating.